In September 2024, the verification of the third batch of 2,055 exchanges, for which FiberCop had requested decommissioning in early 2024, was carried out.
What we do
What we do
In September 2024, the verification of the third batch of 2,055 exchanges, for which FiberCop had requested decommissioning in early 2024, was carried out.